Fuel control · ATA 73-21-78

8061-536 Hydromechanical Fuel Control

Hydromechanical fuel control (HMU) listed by CFM for the CFM56-5A, CFM56-5B and CFM56-5C. Woodward (CAGE 66503) is named as the vendor in CFM's CMM index, which carries it as part number 1348M79P14 in component maintenance manual CM.414, covering 8061-531 through 8061-536.

Request current availability

Send quantity, acceptable conditions, certification, trace, required-by date and delivery country.

Request current availability AOG request

AOG: call +1-307-370-7075 after you submit.

Part identification

Part number8061-536
CFM part number1348M79P14
Component maintenance manualCFM CM.414
Other part numbers in that manual8061-531, 8061-532, 8061-533, 8061-534, 8061-535
Vendor named in CFM's CMM indexWoodward (CAGE 66503)
Component typeFuel control
ATA chapter73-21-78
Engine applicationCFM56-5A, CFM56-5B, CFM56-5C

Engine application as listed in the manufacturer's CMM index. Confirm effectivity in your IPC.

Buyer questions

Which engines use the 8061-536 fuel control?

CFM lists the Woodward 8061-531 to 8061-536 hydromechanical fuel controls under CMM CM.414, ATA 73-21-78, for the CFM56-5A, -5B and -5C. Confirm the dash number your engine requires in the IPC and applicable service bulletins.

Condition and documentation

Tell us which conditions you accept: new, new surplus, overhauled, serviceable, repaired or as removed.

Units of this type are commonly traded on exchange, so say whether an exchange works for you and whether you have a core to return.

Documents to ask for, depending on the unit's condition and history:

  • Repair station release (FAA 8130-3 or EASA Form 1) for overhauled, repaired or inspected units
  • Acceptance test results from the overhaul or repair
  • Manufacturer certificate of conformity for new units, or trace to the last operator with a non-incident statement for used units

CFM's index also lists CMM CM.424, a GE Aircraft Engines manual for piggyback testing of the same 8061-531 to 8061-536 fuel controls. Ask which manual the unit was tested to.

Availability, condition, lead time and documentation are confirmed for the specific unit when APD prepares a quote.

References